RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3314036322 - Archived data from Tue, 11. August 2020 18:02:41 CEST


This is all the information about APD 3314036322. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3314036322
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 19.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 154
Position in Box: 41
EP1 batch: 183
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7437216 V     T = -25 °C: 347.2803321 V
Voltage for Gain 150: T = +20 °C: 389.4244923 V     T = -25 °C: 354.4271138 V
Voltage for Gain 200: T = +20 °C: 393.7000042 V     T = -25 °C: 358.4317948 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.799224336 V-1     T = -25 °C: 4.973389098 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.745195399 V-1     T = -25 °C: 9.385177039 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.31909734 V-1     T = -25 °C: 17.04581835 V-1
Break-through voltage: T = +20 °C: 407.73945 V     T = -25 °C: 372.1063172 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:08:09 CET jreher Updated box and position via API.
11. Aug 2020 18:02:41 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:20 CEST jreher Updated APD location via API.
03. Feb 2020 14:22:29 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:28 CET jreher Updated APD location via API.
27. Nov 2019 19:56:05 CET jreher Updated APD location via API.
25. Nov 2019 17:23:07 CET jreher Updated box and position via API.
01. Oct 2019 11:32:45 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:25 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:34 CEST Tobias Imported from Hamamatsu datasheet.