RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3314036303 - Archived data from Tue, 11. August 2020 18:02:37 CEST


This is all the information about APD 3314036303. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3314036303
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377 V
Dark current: 17.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 154
Position in Box: 25
EP1 batch: 182
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.6240979 V     T = -25 °C: 343.7260907 V
Voltage for Gain 150: T = +20 °C: 385.2609489 V     T = -25 °C: 350.7912426 V
Voltage for Gain 200: T = +20 °C: 389.5423544 V     T = -25 °C: 354.7330609 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.546478463 V-1     T = -25 °C: 5.300492722 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.948631297 V-1     T = -25 °C: 10.18093539 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.71494301 V-1     T = -25 °C: 16.569549 V-1
Break-through voltage: T = +20 °C: 404.7612425 V     T = -25 °C: 369.1943573 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:08:07 CET jreher Updated box and position via API.
11. Aug 2020 18:02:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:19 CEST jreher Updated APD location via API.
03. Feb 2020 14:23:04 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:27 CET jreher Updated APD location via API.
27. Nov 2019 19:56:04 CET jreher Updated APD location via API.
25. Nov 2019 17:23:05 CET jreher Updated box and position via API.
01. Oct 2019 11:32:15 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:25 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:34 CEST Tobias Imported from Hamamatsu datasheet.