RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3314036299 - Archived data from Tue, 11. August 2020 18:02:37 CEST


This is all the information about APD 3314036299. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3314036299
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 385.1 V
Dark current: 27.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 154
Position in Box: 22
EP1 batch: 182
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.6554942 V     T = -25 °C: 349.8379451 V
Voltage for Gain 150: T = +20 °C: 392.4465761 V     T = -25 °C: 357.1567997 V
Voltage for Gain 200: T = +20 °C: 396.788174 V     T = -25 °C: 361.2868953 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.427084025 V-1     T = -25 °C: 5.041729279 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.637411323 V-1     T = -25 °C: 9.384224906 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.97614237 V-1     T = -25 °C: 14.80904384 V-1
Break-through voltage: T = +20 °C: 411.8002432 V     T = -25 °C: 376.0934172 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:08:07 CET jreher Updated box and position via API.
11. Aug 2020 18:02:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:18 CEST jreher Updated APD location via API.
03. Feb 2020 14:23:04 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:27 CET jreher Updated APD location via API.
27. Nov 2019 19:56:04 CET jreher Updated APD location via API.
25. Nov 2019 17:23:04 CET jreher Updated box and position via API.
01. Oct 2019 11:32:15 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:25 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:33 CEST Tobias Imported from Hamamatsu datasheet.