RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3313036229 - Archived data from Tue, 11. August 2020 18:02:27 CEST


This is all the information about APD 3313036229. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3313036229
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 34.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 153
Position in Box: 21
EP1 batch: 181
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9538554 V     T = -25 °C: 346.3929973 V
Voltage for Gain 150: T = +20 °C: 388.6599748 V     T = -25 °C: 353.5724257 V
Voltage for Gain 200: T = +20 °C: 392.9439043 V     T = -25 °C: 357.5894517 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.718475663 V-1     T = -25 °C: 4.916023021 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.451260101 V-1     T = -25 °C: 10.16074986 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.80790861 V-1     T = -25 °C: 16.54455551 V-1
Break-through voltage: T = +20 °C: 406.5716424 V     T = -25 °C: 370.9209452 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:59 CET jreher Updated box and position via API.
11. Aug 2020 18:02:27 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:14 CEST jreher Updated APD location via API.
03. Feb 2020 14:23:24 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:23 CET jreher Updated APD location via API.
27. Nov 2019 19:55:53 CET jreher Updated APD location via API.
25. Nov 2019 17:22:58 CET jreher Updated box and position via API.
01. Oct 2019 11:31:47 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:33 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:23 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:32 CEST Tobias Imported from Hamamatsu datasheet.