RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3313036211 - Archived data from Tue, 11. August 2020 18:02:23 CEST


This is all the information about APD 3313036211. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3313036211
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 386.4 V
Dark current: 31.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 153
Position in Box: 4
EP1 batch: 180
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.8460409 V     T = -25 °C: 350.952542 V
Voltage for Gain 150: T = +20 °C: 393.6233199 V     T = -25 °C: 358.2202214 V
Voltage for Gain 200: T = +20 °C: 397.9472048 V     T = -25 °C: 362.2945214 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.691592675 V-1     T = -25 °C: 4.827551085 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.317705586 V-1     T = -25 °C: 9.595196153 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.62098567 V-1     T = -25 °C: 14.6805898 V-1
Break-through voltage: T = +20 °C: 411.8044317 V     T = -25 °C: 375.9732726 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:57 CET jreher Updated box and position via API.
11. Aug 2020 18:02:23 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:12 CEST jreher Updated APD location via API.
03. Feb 2020 14:23:45 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:22 CET jreher Updated APD location via API.
27. Nov 2019 19:55:52 CET jreher Updated APD location via API.
25. Nov 2019 17:22:57 CET jreher Updated box and position via API.
01. Oct 2019 11:31:24 CEST spankonin Updated APD batch assignment via API.
01. Oct 2019 11:30:25 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:32 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:22 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:32 CEST Tobias Imported from Hamamatsu datasheet.