RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3313036203 - Archived data from Fri, 05. February 2021 11:07:54 CET


This is all the information about APD 3313036203. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3313036203
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 31.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 152
Position in Box: 48
EP1 batch: 180
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.1971192 V     T = -25 °C: 344.6108876 V
Voltage for Gain 150: T = +20 °C: 385.8724769 V     T = -25 °C: 351.8993382 V
Voltage for Gain 200: T = +20 °C: 390.1760398 V     T = -25 °C: 355.9327024 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.610218634 V-1     T = -25 °C: 4.473504306 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.172357464 V-1     T = -25 °C: 9.458333224 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.3264032 V-1     T = -25 °C: 14.04448411 V-1
Break-through voltage: T = +20 °C: 407.493794 V     T = -25 °C: 370.6377199 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:41:48 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:02:37 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:58:55 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:51:44 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:07:54 CET jreher Updated box and position via API.
11. Aug 2020 18:02:22 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:12 CEST jreher Updated APD location via API.
03. Feb 2020 14:23:44 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:21 CET jreher Updated APD location via API.
27. Nov 2019 19:55:44 CET jreher Updated APD location via API.
25. Nov 2019 17:22:56 CET jreher Updated box and position via API.
01. Oct 2019 11:31:23 CEST spankonin Updated APD batch assignment via API.
01. Oct 2019 11:30:25 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:27 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:22 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:32 CEST Tobias Imported from Hamamatsu datasheet.