RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3312036107 - Archived data from Tue, 11. August 2020 18:02:09 CEST


This is all the information about APD 3312036107. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3312036107
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H06
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 385.3 V
Dark current: 31.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 151
Position in Box: 33
EP1 batch: 178
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.9354611 V     T = -25 °C: 350.8064049 V
Voltage for Gain 150: T = +20 °C: 393.7444097 V     T = -25 °C: 358.1927332 V
Voltage for Gain 200: T = +20 °C: 398.1017341 V     T = -25 °C: 362.3364249 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.643579699 V-1     T = -25 °C: 5.195259504 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.103548976 V-1     T = -25 °C: 9.694927609 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.42818344 V-1     T = -25 °C: 14.87639322 V-1
Break-through voltage: T = +20 °C: 411.7669631 V     T = -25 °C: 375.821653 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:45 CET jreher Updated box and position via API.
11. Aug 2020 18:02:09 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:06 CEST jreher Updated APD location via API.
03. Feb 2020 14:24:22 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:16 CET jreher Updated APD location via API.
27. Nov 2019 19:55:32 CET jreher Updated APD location via API.
25. Nov 2019 17:22:50 CET jreher Updated box and position via API.
26. Sep 2019 15:32:33 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:18 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:20 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:30 CEST Tobias Imported from Hamamatsu datasheet.