RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3311036048 - Archived data from Tue, 11. August 2020 18:02:01 CEST


This is all the information about APD 3311036048. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3311036048
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E13
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.3 V
Dark current: 18.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 150
Position in Box: 43
EP1 batch: 176
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.2917531 V     T = -25 °C: 353.9172403 V
Voltage for Gain 150: T = +20 °C: 397.0382836 V     T = -25 °C: 361.268307 V
Voltage for Gain 200: T = +20 °C: 401.3470823 V     T = -25 °C: 365.3966719 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.563044488 V-1     T = -25 °C: 5.010597968 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.076136893 V-1     T = -25 °C: 9.298566603 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.2162634 V-1     T = -25 °C: 14.67998946 V-1
Break-through voltage: T = +20 °C: 416.2811215 V     T = -25 °C: 380.2463068 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:38 CET jreher Updated box and position via API.
11. Aug 2020 18:02:01 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:02 CEST jreher Updated APD location via API.
03. Feb 2020 14:24:42 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:13 CET jreher Updated APD location via API.
27. Nov 2019 19:55:21 CET jreher Updated APD location via API.
25. Nov 2019 17:22:46 CET jreher Updated box and position via API.
26. Sep 2019 15:33:18 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:11 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:19 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:30 CEST Tobias Imported from Hamamatsu datasheet.