RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3311036047 - Archived data from Tue, 11. August 2020 18:02:01 CEST


This is all the information about APD 3311036047. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3311036047
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 16.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 150
Position in Box: 42
EP1 batch: 176
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1225521 V     T = -25 °C: 346.710868 V
Voltage for Gain 150: T = +20 °C: 388.8410393 V     T = -25 °C: 353.8764714 V
Voltage for Gain 200: T = +20 °C: 393.1426223 V     T = -25 °C: 357.8996653 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.667239979 V-1     T = -25 °C: 4.821517662 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.268596288 V-1     T = -25 °C: 9.879525872 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.53307347 V-1     T = -25 °C: 16.00147614 V-1
Break-through voltage: T = +20 °C: 406.7909867 V     T = -25 °C: 371.2030083 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:38 CET jreher Updated box and position via API.
11. Aug 2020 18:02:01 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:02 CEST jreher Updated APD location via API.
03. Feb 2020 14:25:04 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:13 CET jreher Updated APD location via API.
27. Nov 2019 19:55:21 CET jreher Updated APD location via API.
25. Nov 2019 17:22:46 CET jreher Updated box and position via API.
26. Sep 2019 15:33:18 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:11 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:19 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:29 CEST Tobias Imported from Hamamatsu datasheet.