RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3310035997 - Archived data from Tue, 11. August 2020 18:01:56 CEST


This is all the information about APD 3310035997. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3310035997
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 32.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 150
Position in Box: 14
EP1 batch: 175
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.8973337 V     T = -25 °C: 349.7006565 V
Voltage for Gain 150: T = +20 °C: 392.7282654 V     T = -25 °C: 357.0298208 V
Voltage for Gain 200: T = +20 °C: 397.0775671 V     T = -25 °C: 361.1611865 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.652033328 V-1     T = -25 °C: 4.689989168 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.271758349 V-1     T = -25 °C: 9.50668865 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.45715473 V-1     T = -25 °C: 15.03204248 V-1
Break-through voltage: T = +20 °C: 412.1707509 V     T = -25 °C: 376.1513463 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:35 CET jreher Updated box and position via API.
11. Aug 2020 18:01:56 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:59 CEST jreher Updated APD location via API.
03. Feb 2020 14:25:02 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:10 CET jreher Updated APD location via API.
27. Nov 2019 19:55:19 CET jreher Updated APD location via API.
25. Nov 2019 17:22:44 CET jreher Updated box and position via API.
26. Sep 2019 15:34:03 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:09 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:18 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:29 CEST Tobias Imported from Hamamatsu datasheet.