RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3310035968 - Archived data from Tue, 11. August 2020 18:01:50 CEST


This is all the information about APD 3310035968. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3310035968
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 388.4 V
Dark current: 27.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 149
Position in Box: 25
EP1 batch: 175
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.3777429 V     T = -25 °C: 352.8699529 V
Voltage for Gain 150: T = +20 °C: 396.1314448 V     T = -25 °C: 360.1910443 V
Voltage for Gain 200: T = +20 °C: 400.4452958 V     T = -25 °C: 364.3115619 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.513232581 V-1     T = -25 °C: 4.990152213 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.957229236 V-1     T = -25 °C: 9.359585712 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.79299254 V-1     T = -25 °C: 14.72756624 V-1
Break-through voltage: T = +20 °C: 415.6760087 V     T = -25 °C: 379.4307578 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:30 CET jreher Updated box and position via API.
11. Aug 2020 18:01:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:57 CEST jreher Updated APD location via API.
03. Feb 2020 14:25:22 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:08 CET jreher Updated APD location via API.
27. Nov 2019 19:55:10 CET jreher Updated APD location via API.
25. Nov 2019 17:22:40 CET jreher Updated box and position via API.
26. Sep 2019 15:34:01 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:03 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:17 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:28 CEST Tobias Imported from Hamamatsu datasheet.