RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3310035963 - Archived data from Tue, 11. August 2020 18:01:50 CEST


This is all the information about APD 3310035963. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3310035963
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 385 V
Dark current: 27.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 149
Position in Box: 20
EP1 batch: 174
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.8185769 V     T = -25 °C: 349.6920603 V
Voltage for Gain 150: T = +20 °C: 392.5351188 V     T = -25 °C: 356.9659982 V
Voltage for Gain 200: T = +20 °C: 396.808382 V     T = -25 °C: 361.0382679 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.777982958 V-1     T = -25 °C: 4.751739941 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.702357214 V-1     T = -25 °C: 9.69888033 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.30796434 V-1     T = -25 °C: 15.52820849 V-1
Break-through voltage: T = +20 °C: 410.582336 V     T = -25 °C: 374.7735375 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:29 CET jreher Updated box and position via API.
11. Aug 2020 18:01:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:56 CEST jreher Updated APD location via API.
03. Feb 2020 14:25:22 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:08 CET jreher Updated APD location via API.
27. Nov 2019 19:55:09 CET jreher Updated APD location via API.
25. Nov 2019 17:22:40 CET jreher Updated box and position via API.
26. Sep 2019 15:34:31 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:16 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:28 CEST Tobias Imported from Hamamatsu datasheet.