RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3306035796 - Archived data from Tue, 11. August 2020 18:01:31 CEST


This is all the information about APD 3306035796. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3306035796
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 36.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 147
Position in Box: 24
EP1 batch: 171
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.525559 V     T = -25 °C: 348.3737237 V
Voltage for Gain 150: T = +20 °C: 390.2479839 V     T = -25 °C: 355.5718331 V
Voltage for Gain 200: T = +20 °C: 394.5948596 V     T = -25 °C: 359.6119988 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.457642354 V-1     T = -25 °C: 4.949759816 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.824354092 V-1     T = -25 °C: 9.127313553 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.40429814 V-1     T = -25 °C: 16.46845358 V-1
Break-through voltage: T = +20 °C: 409.874687 V     T = -25 °C: 374.3908388 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:14 CET jreher Updated box and position via API.
11. Aug 2020 18:01:31 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:48 CEST jreher Updated APD location via API.
30. Jan 2020 14:04:14 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:00 CET jreher Updated APD location via API.
27. Nov 2019 19:54:48 CET jreher Updated APD location via API.
25. Nov 2019 17:22:31 CET jreher Updated box and position via API.
26. Sep 2019 15:35:38 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:13 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:26 CEST Tobias Imported from Hamamatsu datasheet.