RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3306035789 - Archived data from Tue, 11. August 2020 18:01:30 CEST


This is all the information about APD 3306035789. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3306035789
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 385.3 V
Dark current: 34.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 147
Position in Box: 19
EP1 batch: 171
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.2557554 V     T = -25 °C: 350.6308016 V
Voltage for Gain 150: T = +20 °C: 393.0162298 V     T = -25 °C: 357.8602227 V
Voltage for Gain 200: T = +20 °C: 397.386251 V     T = -25 °C: 361.9283399 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.584571636 V-1     T = -25 °C: 4.622906809 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.98370503 V-1     T = -25 °C: 9.978463848 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.59171289 V-1     T = -25 °C: 15.75401066 V-1
Break-through voltage: T = +20 °C: 411.6174544 V     T = -25 °C: 376.0333334 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:14 CET jreher Updated box and position via API.
11. Aug 2020 18:01:30 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:47 CEST jreher Updated APD location via API.
30. Jan 2020 14:04:13 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:00 CET jreher Updated APD location via API.
27. Nov 2019 19:54:47 CET jreher Updated APD location via API.
25. Nov 2019 17:22:30 CET jreher Updated box and position via API.
26. Sep 2019 15:35:38 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:13 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:26 CEST Tobias Imported from Hamamatsu datasheet.