RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3305035745 - Archived data from Tue, 11. August 2020 18:01:25 CEST


This is all the information about APD 3305035745. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3305035745
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 31.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 146
Position in Box: 42
EP1 batch: 170
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3914147 V     T = -25 °C: 344.3208277 V
Voltage for Gain 150: T = +20 °C: 386.024599 V     T = -25 °C: 351.4538758 V
Voltage for Gain 200: T = +20 °C: 390.3047327 V     T = -25 °C: 355.525436 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.65229571 V-1     T = -25 °C: 5.236950746 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.221787762 V-1     T = -25 °C: 9.780086781 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.40830677 V-1     T = -25 °C: 17.05270023 V-1
Break-through voltage: T = +20 °C: 404.9175371 V     T = -25 °C: 369.7038937 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:09 CET jreher Updated box and position via API.
11. Aug 2020 18:01:25 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:45 CEST jreher Updated APD location via API.
28. Jan 2020 16:59:07 CET vwerner Updated APD batch assignment via API.
28. Jan 2020 16:50:40 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:48:58 CET jreher Updated APD location via API.
27. Nov 2019 19:54:38 CET jreher Updated APD location via API.
25. Nov 2019 17:22:27 CET jreher Updated box and position via API.
23. Sep 2019 17:21:02 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:12 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:25 CEST Tobias Imported from Hamamatsu datasheet.