RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3304035716 - Archived data from Tue, 11. August 2020 18:01:23 CEST


This is all the information about APD 3304035716. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3304035716
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 383.3 V
Dark current: 23.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 146
Position in Box: 31
EP1 batch: 170
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6329315 V     T = -25 °C: 348.0792686 V
Voltage for Gain 150: T = +20 °C: 390.3998354 V     T = -25 °C: 355.3699718 V
Voltage for Gain 200: T = +20 °C: 394.7338199 V     T = -25 °C: 359.4125784 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.421333963 V-1     T = -25 °C: 4.75240802 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.650501039 V-1     T = -25 °C: 9.25195258 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.90676784 V-1     T = -25 °C: 17.0294729 V-1
Break-through voltage: T = +20 °C: 409.605277 V     T = -25 °C: 374.1653287 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:07 CET jreher Updated box and position via API.
11. Aug 2020 18:01:23 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:44 CEST jreher Updated APD location via API.
28. Jan 2020 16:59:06 CET vwerner Updated APD batch assignment via API.
28. Jan 2020 16:50:39 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:48:57 CET jreher Updated APD location via API.
27. Nov 2019 19:54:37 CET jreher Updated APD location via API.
25. Nov 2019 17:22:26 CET jreher Updated box and position via API.
23. Sep 2019 17:21:01 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:12 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:25 CEST Tobias Imported from Hamamatsu datasheet.