RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3304035705 - Archived data from Tue, 11. August 2020 18:01:21 CEST


This is all the information about APD 3304035705. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3304035705
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F14
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 35.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 146
Position in Box: 22
EP1 batch: 170
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.0010775 V     T = -25 °C: 349.1414071 V
Voltage for Gain 150: T = +20 °C: 389.7467975 V     T = -25 °C: 356.5149188 V
Voltage for Gain 200: T = +20 °C: 394.0843788 V     T = -25 °C: 359.2886165 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.697540956 V-1     T = -25 °C: 4.718327831 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.251588771 V-1     T = -25 °C: 9.103087053 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.39963394 V-1     T = -25 °C: 36.37952505 V-1
Break-through voltage: T = +20 °C: 408.8295776 V     T = -25 °C: 373.9071173 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:07 CET jreher Updated box and position via API.
11. Aug 2020 18:01:21 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:43 CEST jreher Updated APD location via API.
28. Jan 2020 16:59:05 CET vwerner Updated APD batch assignment via API.
28. Jan 2020 16:50:38 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:48:56 CET jreher Updated APD location via API.
27. Nov 2019 19:54:36 CET jreher Updated APD location via API.
25. Nov 2019 17:22:26 CET jreher Updated box and position via API.
23. Sep 2019 17:21:00 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:39 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:11 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:25 CEST Tobias Imported from Hamamatsu datasheet.