RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3303035667 - Archived data from Tue, 11. August 2020 18:01:18 CEST


This is all the information about APD 3303035667. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3303035667
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.5 V
Dark current: 24.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 146
Position in Box: 5
EP1 batch: 169
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3532453 V     T = -25 °C: 349.6461391 V
Voltage for Gain 150: T = +20 °C: 392.0576251 V     T = -25 °C: 356.8621368 V
Voltage for Gain 200: T = +20 °C: 396.3661975 V     T = -25 °C: 360.9160079 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.587630311 V-1     T = -25 °C: 4.785236903 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.092937389 V-1     T = -25 °C: 9.885542517 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.12420472 V-1     T = -25 °C: 15.73910441 V-1
Break-through voltage: T = +20 °C: 410.7545025 V     T = -25 °C: 375.2175009 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:05 CET jreher Updated box and position via API.
11. Aug 2020 18:01:18 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:42 CEST jreher Updated APD location via API.
28. Jan 2020 16:36:48 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:55 CET jreher Updated APD location via API.
27. Nov 2019 19:54:35 CET jreher Updated APD location via API.
25. Nov 2019 17:22:24 CET jreher Updated box and position via API.
23. Sep 2019 17:21:26 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:38 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:11 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:24 CEST Tobias Imported from Hamamatsu datasheet.