RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3303035655 - Archived data from Tue, 11. August 2020 18:01:16 CEST


This is all the information about APD 3303035655. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3303035655
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 36.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 145
Position in Box: 46
EP1 batch: 169
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2281427 V     T = -25 °C: 345.2850905 V
Voltage for Gain 150: T = +20 °C: 386.8442427 V     T = -25 °C: 352.3381544 V
Voltage for Gain 200: T = +20 °C: 391.0786995 V     T = -25 °C: 356.2803547 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.717272015 V-1     T = -25 °C: 5.074333631 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.515040138 V-1     T = -25 °C: 9.7650171 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.12261896 V-1     T = -25 °C: 15.8379296 V-1
Break-through voltage: T = +20 °C: 405.0550356 V     T = -25 °C: 369.6525347 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:07:01 CET jreher Updated box and position via API.
11. Aug 2020 18:01:16 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:41 CEST jreher Updated APD location via API.
28. Jan 2020 16:36:47 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:54 CET jreher Updated APD location via API.
27. Nov 2019 19:54:27 CET jreher Updated APD location via API.
25. Nov 2019 17:22:23 CET jreher Updated box and position via API.
23. Sep 2019 17:21:26 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:33 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:10 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:24 CEST Tobias Imported from Hamamatsu datasheet.