RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3302035610 - Archived data from Tue, 11. August 2020 18:01:10 CEST


This is all the information about APD 3302035610. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3302035610
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 24.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 145
Position in Box: 17
EP1 batch: 168
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.7233008 V     T = -25 °C: 345.3843715 V
Voltage for Gain 150: T = +20 °C: 387.4177882 V     T = -25 °C: 352.5487411 V
Voltage for Gain 200: T = +20 °C: 391.7149891 V     T = -25 °C: 356.5566568 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.813816377 V-1     T = -25 °C: 4.923476142 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.724820704 V-1     T = -25 °C: 10.2535233 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.12417473 V-1     T = -25 °C: 16.62006582 V-1
Break-through voltage: T = +20 °C: 406.7683678 V     T = -25 °C: 371.0717285 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:58 CET jreher Updated box and position via API.
11. Aug 2020 18:01:10 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:38 CEST jreher Updated APD location via API.
28. Jan 2020 16:32:53 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:52 CET jreher Updated APD location via API.
27. Nov 2019 19:54:25 CET jreher Updated APD location via API.
25. Nov 2019 17:22:20 CET jreher Updated box and position via API.
23. Sep 2019 17:21:47 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:09 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:23 CEST Tobias Imported from Hamamatsu datasheet.