RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3302035603 - Archived data from Tue, 11. August 2020 18:01:09 CEST


This is all the information about APD 3302035603. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3302035603
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 387.2 V
Dark current: 28.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 145
Position in Box: 11
EP1 batch: 168
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.8571059 V     T = -25 °C: 351.7659624 V
Voltage for Gain 150: T = +20 °C: 394.5939356 V     T = -25 °C: 359.0512767 V
Voltage for Gain 200: T = +20 °C: 398.8793466 V     T = -25 °C: 363.1432641 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.709376024 V-1     T = -25 °C: 5.080005535 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.4380811 V-1     T = -25 °C: 9.520593349 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.98033446 V-1     T = -25 °C: 15.10772529 V-1
Break-through voltage: T = +20 °C: 413.6848916 V     T = -25 °C: 377.8269132 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:57 CET jreher Updated box and position via API.
11. Aug 2020 18:01:09 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:38 CEST jreher Updated APD location via API.
28. Jan 2020 16:32:53 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:52 CET jreher Updated APD location via API.
27. Nov 2019 19:54:25 CET jreher Updated APD location via API.
25. Nov 2019 17:22:20 CET jreher Updated box and position via API.
23. Sep 2019 17:21:47 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:09 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:23 CEST Tobias Imported from Hamamatsu datasheet.