RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3301035563 - Archived data from Tue, 11. August 2020 17:55:22 CEST


This is all the information about APD 3301035563. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3301035563
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 27.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 144
Position in Box: 43
EP1 batch: 167
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.0886564 V     T = -25 °C: 349.3118759 V
Voltage for Gain 150: T = +20 °C: 391.8328391 V     T = -25 °C: 356.5544029 V
Voltage for Gain 200: T = +20 °C: 396.1439508 V     T = -25 °C: 360.6091201 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.651178548 V-1     T = -25 °C: 4.896301352 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.243739425 V-1     T = -25 °C: 9.135533338 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.41020259 V-1     T = -25 °C: 16.45875951 V-1
Break-through voltage: T = +20 °C: 410.6647382 V     T = -25 °C: 374.816384 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:53 CET jreher Updated box and position via API.
11. Aug 2020 17:55:22 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:36 CEST jreher Updated APD location via API.
12. Dec 2019 14:39:10 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:50 CET jreher Updated APD location via API.
27. Nov 2019 19:54:16 CET jreher Updated APD location via API.
25. Nov 2019 17:22:18 CET jreher Updated box and position via API.
23. Sep 2019 17:22:08 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:25 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:08 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:22 CEST Tobias Imported from Hamamatsu datasheet.