RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3301035524 - Archived data from Tue, 11. August 2020 17:55:15 CEST


This is all the information about APD 3301035524. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3301035524
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 23.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 144
Position in Box: 11
EP1 batch: 166
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.1796619 V     T = -25 °C: 352.25704 V
Voltage for Gain 150: T = +20 °C: 394.9658293 V     T = -25 °C: 359.5102041 V
Voltage for Gain 200: T = +20 °C: 399.298641 V     T = -25 °C: 363.5650374 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.558710686 V-1     T = -25 °C: 4.93689883 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.060779774 V-1     T = -25 °C: 9.150330805 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.15755575 V-1     T = -25 °C: 16.55335543 V-1
Break-through voltage: T = +20 °C: 414.4156689 V     T = -25 °C: 378.3597374 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:50 CET jreher Updated box and position via API.
11. Aug 2020 17:55:15 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:33 CEST jreher Updated APD location via API.
12. Dec 2019 14:39:51 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:48 CET jreher Updated APD location via API.
27. Nov 2019 19:54:14 CET jreher Updated APD location via API.
25. Nov 2019 17:22:15 CET jreher Updated box and position via API.
23. Sep 2019 17:22:27 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:22 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:07 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:21 CEST Tobias Imported from Hamamatsu datasheet.