RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3301035520 - Archived data from Tue, 11. August 2020 17:55:15 CEST


This is all the information about APD 3301035520. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3301035520
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 18.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 144
Position in Box: 7
EP1 batch: 166
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6194309 V     T = -25 °C: 348.0492766 V
Voltage for Gain 150: T = +20 °C: 390.3219996 V     T = -25 °C: 355.1614975 V
Voltage for Gain 200: T = +20 °C: 394.6130971 V     T = -25 °C: 359.1544963 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.474123614 V-1     T = -25 °C: 5.075459065 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.762172904 V-1     T = -25 °C: 9.585166963 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32223565 V-1     T = -25 °C: 15.36947257 V-1
Break-through voltage: T = +20 °C: 407.9157385 V     T = -25 °C: 372.1055186 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:49 CET jreher Updated box and position via API.
11. Aug 2020 17:55:15 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:33 CEST jreher Updated APD location via API.
12. Dec 2019 14:39:51 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:47 CET jreher Updated APD location via API.
27. Nov 2019 19:54:13 CET jreher Updated APD location via API.
25. Nov 2019 17:22:15 CET jreher Updated box and position via API.
23. Sep 2019 17:22:27 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:22 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:07 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:21 CEST Tobias Imported from Hamamatsu datasheet.