RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3217035504 - Archived data from Fri, 05. February 2021 11:06:46 CET


This is all the information about APD 3217035504. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3217035504
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 391.3 V
Dark current: 25.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 53
Position in Box: 50
EP1 batch: 166
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.4902724 V     T = -25 °C: 356.9674726 V
Voltage for Gain 150: T = +20 °C: 400.2234595 V     T = -25 °C: 363.7160962 V
Voltage for Gain 200: T = +20 °C: 404.4992903 V     T = -25 °C: 367.9287409 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.482595062 V-1     T = -25 °C: 10.65181938 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.956418993 V-1     T = -25 °C: 9.572415 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.95454926 V-1     T = -25 °C: 15.26374802 V-1
Break-through voltage: T = +20 °C: 417.6184712 V     T = -25 °C: 381.3351722 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:46:19 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:06:46 CET jreher Updated box and position via API.
11. Aug 2020 18:01:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:32 CEST jreher Updated APD location via API.
28. Jan 2020 16:32:52 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:47 CET jreher Updated APD location via API.
27. Nov 2019 19:54:05 CET jreher Updated APD location via API.
25. Nov 2019 17:22:13 CET jreher Updated box and position via API.
23. Sep 2019 17:22:26 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:17 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:07 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:25 CEST Tobias Imported from Hamamatsu datasheet.