RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3217035499 - Archived data from Tue, 11. August 2020 18:01:06 CEST


This is all the information about APD 3217035499. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3217035499
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 387.1 V
Dark current: 25 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 143
Position in Box: 7
EP1 batch: 166
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.3589304 V     T = -25 °C: 350.5818239 V
Voltage for Gain 150: T = +20 °C: 394.1982678 V     T = -25 °C: 358.0304149 V
Voltage for Gain 200: T = +20 °C: 398.5423508 V     T = -25 °C: 362.216684 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.45832666 V-1     T = -25 °C: 4.674204714 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.793875395 V-1     T = -25 °C: 9.311342649 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.31941228 V-1     T = -25 °C: 14.57860317 V-1
Break-through voltage: T = +20 °C: 412.7307894 V     T = -25 °C: 376.3889528 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 16:11:58 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:46 CEST jreher Updated box and position via API.
05. Feb 2021 11:06:46 CET jreher Updated box and position via API.
11. Aug 2020 18:01:06 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:32 CEST jreher Updated APD location via API.
28. Jan 2020 16:22:51 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:47 CET jreher Updated APD location via API.
27. Nov 2019 19:54:05 CET jreher Updated APD location via API.
25. Nov 2019 17:22:13 CET jreher Updated box and position via API.
23. Sep 2019 17:22:26 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:17 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:07 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:25 CEST Tobias Imported from Hamamatsu datasheet.