RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3216035484 - Archived data from Tue, 11. August 2020 18:01:06 CEST


This is all the information about APD 3216035484. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3216035484
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 391 V
Dark current: 27 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 53
Position in Box: 43
EP1 batch: 165
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.4061883 V     T = -25 °C: 355.2863211 V
Voltage for Gain 150: T = +20 °C: 399.1809636 V     T = -25 °C: 362.8575276 V
Voltage for Gain 200: T = +20 °C: 403.495641 V     T = -25 °C: 367.0931012 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.492473519 V-1     T = -25 °C: 4.704162192 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.882457226 V-1     T = -25 °C: 9.412455861 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.72376649 V-1     T = -25 °C: 14.72421369 V-1
Break-through voltage: T = +20 °C: 417.5455611 V     T = -25 °C: 381.3865101 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:46:18 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:06:45 CET jreher Updated box and position via API.
11. Aug 2020 18:01:06 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:31 CEST jreher Updated APD location via API.
28. Jan 2020 16:22:50 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:46 CET jreher Updated APD location via API.
27. Nov 2019 19:54:04 CET jreher Updated APD location via API.
25. Nov 2019 17:22:13 CET jreher Updated box and position via API.
04. Oct 2019 11:19:21 CEST spankonin Updated APD batch assignment via API.
23. Sep 2019 17:22:55 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:17 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:07 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:25 CEST Tobias Imported from Hamamatsu datasheet.