RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3215035440 - Archived data from Fri, 05. February 2021 11:06:41 CET


This is all the information about APD 3215035440. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3215035440
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.7 V
Dark current: 27.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 142
Position in Box: 33
EP1 batch: 165
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.8212509 V     T = -25 °C: 348.3537261 V
Voltage for Gain 150: T = +20 °C: 391.6192042 V     T = -25 °C: 355.692871 V
Voltage for Gain 200: T = +20 °C: 395.9323145 V     T = -25 °C: 359.794007 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.678597406 V-1     T = -25 °C: 4.832633213 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.426148792 V-1     T = -25 °C: 9.876090623 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.86067188 V-1     T = -25 °C: 15.80688375 V-1
Break-through voltage: T = +20 °C: 410.6627249 V     T = -25 °C: 374.3108573 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:43:23 CET jreher Assigned to capsule by script
05. Feb 2021 11:06:41 CET jreher Updated box and position via API.
18. Dec 2020 14:00:39 CET jreher Updated box and position via API.
11. Aug 2020 17:55:10 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:29 CEST jreher Updated APD location via API.
12. Dec 2019 14:40:11 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:45 CET jreher Updated APD location via API.
27. Nov 2019 19:53:57 CET jreher Updated APD location via API.
25. Nov 2019 17:22:11 CET jreher Updated box and position via API.
04. Oct 2019 11:19:20 CEST spankonin Updated APD batch assignment via API.
23. Sep 2019 17:22:54 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:55:14 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:06 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:25 CEST Tobias Imported from Hamamatsu datasheet.