RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3215035420 - Archived data from Fri, 05. February 2021 11:06:39 CET


This is all the information about APD 3215035420. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3215035420
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 21.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 142
Position in Box: 17
EP1 batch: 164
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.5413525 V     T = -25 °C: 346.2350625 V
Voltage for Gain 150: T = +20 °C: 389.4008622 V     T = -25 °C: 353.5576785 V
Voltage for Gain 200: T = +20 °C: 393.7505648 V     T = -25 °C: 357.6596888 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.420888876 V-1     T = -25 °C: 4.874325167 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.580622262 V-1     T = -25 °C: 9.968344187 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.89326766 V-1     T = -25 °C: 15.93258081 V-1
Break-through voltage: T = +20 °C: 409.0173803 V     T = -25 °C: 372.6114124 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:25:13 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:56 CEST jreher Updated box and position via API.
05. Feb 2021 11:06:39 CET jreher Updated box and position via API.
11. Aug 2020 17:55:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:28 CEST jreher Updated APD location via API.
12. Dec 2019 14:40:10 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:44 CET jreher Updated APD location via API.
27. Nov 2019 19:53:55 CET jreher Updated APD location via API.
25. Nov 2019 17:22:09 CET jreher Updated box and position via API.
20. Sep 2019 18:49:48 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:55:13 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:05 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:24 CEST Tobias Imported from Hamamatsu datasheet.