RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3214035386 - Archived data from Wed, 14. April 2021 18:13:30 CEST


This is all the information about APD 3214035386. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3214035386
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 3214035386/2910033158
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 25.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 141
Position in Box: 50
EP1 batch: 164
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9086403 V     T = -25 °C: 344.8857772 V
Voltage for Gain 150: T = +20 °C: 387.7585435 V     T = -25 °C: 352.1269641 V
Voltage for Gain 200: T = +20 °C: 392.1249881 V     T = -25 °C: 356.1987255 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.648702564 V-1     T = -25 °C: 5.0440249 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.223354293 V-1     T = -25 °C: 9.558602484 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.3074456 V-1     T = -25 °C: 15.14712183 V-1
Break-through voltage: T = +20 °C: 407.8562149 V     T = -25 °C: 371.3302229 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:03 CEST jreher Updated box and position via API.
14. Apr 2021 18:13:30 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:06:35 CET jreher Updated box and position via API.
11. Aug 2020 17:55:04 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:26 CEST jreher Updated APD location via API.
12. Dec 2019 14:41:09 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:43 CET jreher Updated APD location via API.
27. Nov 2019 19:53:47 CET jreher Updated APD location via API.
25. Nov 2019 17:22:07 CET jreher Updated box and position via API.
20. Sep 2019 18:49:47 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:55:08 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:05 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:24 CEST Tobias Imported from Hamamatsu datasheet.