RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3213035330 - Archived data from Tue, 11. August 2020 17:54:55 CEST


This is all the information about APD 3213035330. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3213035330
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 424 V
Voltage for Gain 100 (T=+25°C): 397.9 V
Dark current: 30.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 141
Position in Box: 10
EP1 batch: 163
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 397.9373568 V     T = -25 °C: 361.609479 V
Voltage for Gain 150: T = +20 °C: 405.7616602 V     T = -25 °C: 369.2801776 V
Voltage for Gain 200: T = +20 °C: 410.0955483 V     T = -25 °C: 373.5687941 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.631615823 V-1     T = -25 °C: 4.527534176 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.26337998 V-1     T = -25 °C: 8.932520813 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.5089627 V-1     T = -25 °C: 15.67316236 V-1
Break-through voltage: T = +20 °C: 423.537388 V     T = -25 °C: 387.6900839 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:30 CET jreher Updated box and position via API.
11. Aug 2020 17:54:55 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:23 CEST jreher Updated APD location via API.
12. Dec 2019 14:41:56 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:40 CET jreher Updated APD location via API.
27. Nov 2019 19:53:44 CET jreher Updated APD location via API.
25. Nov 2019 17:22:04 CET jreher Updated box and position via API.
20. Sep 2019 18:49:14 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:55:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:03 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:23 CEST Tobias Imported from Hamamatsu datasheet.