RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3212035303 - Archived data from Fri, 05. February 2021 11:06:25 CET


This is all the information about APD 3212035303. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3212035303
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 393.2 V
Dark current: 23.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 140
Position in Box: 40
EP1 batch: 162
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.5470401 V     T = -25 °C: 357.2330133 V
Voltage for Gain 150: T = +20 °C: 401.3597051 V     T = -25 °C: 364.8460726 V
Voltage for Gain 200: T = +20 °C: 405.6772622 V     T = -25 °C: 369.1368093 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.44435988 V-1     T = -25 °C: 4.672564193 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.682518641 V-1     T = -25 °C: 9.305261889 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.26966686 V-1     T = -25 °C: 14.54719533 V-1
Break-through voltage: T = +20 °C: 420.4085523 V     T = -25 °C: 384.405507 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:18:05 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:14:54 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:06:25 CET jreher Updated box and position via API.
11. Aug 2020 17:54:51 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:21 CEST jreher Updated APD location via API.
12. Dec 2019 14:42:35 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:38 CET jreher Updated APD location via API.
27. Nov 2019 19:53:35 CET jreher Updated APD location via API.
25. Nov 2019 17:22:01 CET jreher Updated box and position via API.
20. Sep 2019 18:48:50 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:59 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:03 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:23 CEST Tobias Imported from Hamamatsu datasheet.