RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3211035232 - Archived data from Tue, 11. August 2020 17:54:42 CEST


This is all the information about APD 3211035232. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3211035232
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 384 V
Dark current: 24.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 139
Position in Box: 45
EP1 batch: 160
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.2931722 V     T = -25 °C: 348.9587063 V
Voltage for Gain 150: T = +20 °C: 392.0943421 V     T = -25 °C: 356.3718135 V
Voltage for Gain 200: T = +20 °C: 396.4320278 V     T = -25 °C: 360.5329281 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.529548696 V-1     T = -25 °C: 4.915002511 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.961577213 V-1     T = -25 °C: 9.073835084 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.81533963 V-1     T = -25 °C: 16.05561946 V-1
Break-through voltage: T = +20 °C: 410.5883515 V     T = -25 °C: 375.1985808 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:18 CET jreher Updated box and position via API.
11. Aug 2020 17:54:42 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:16 CEST jreher Updated APD location via API.
12. Dec 2019 14:43:12 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:35 CET jreher Updated APD location via API.
27. Nov 2019 19:53:24 CET jreher Updated APD location via API.
25. Nov 2019 17:21:57 CET jreher Updated box and position via API.
20. Sep 2019 18:47:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:01 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:22 CEST Tobias Imported from Hamamatsu datasheet.