RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3211035224 - Archived data from Fri, 05. February 2021 11:06:17 CET


This is all the information about APD 3211035224. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3211035224
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 387.6 V
Dark current: 26.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 139
Position in Box: 39
EP1 batch: 160
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.5411214 V     T = -25 °C: 351.7245696 V
Voltage for Gain 150: T = +20 °C: 395.3659015 V     T = -25 °C: 359.2246678 V
Voltage for Gain 200: T = +20 °C: 399.71172 V     T = -25 °C: 363.4636527 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.431249212 V-1     T = -25 °C: 4.598192969 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.754050439 V-1     T = -25 °C: 9.144692675 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.28242906 V-1     T = -25 °C: 14.22359367 V-1
Break-through voltage: T = +20 °C: 413.9237465 V     T = -25 °C: 378.0710678 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:08 CEST jreher Updated box and position via API.
15. Apr 2021 16:43:12 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:06:17 CET jreher Updated box and position via API.
11. Aug 2020 17:54:41 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:16 CEST jreher Updated APD location via API.
12. Dec 2019 14:43:11 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:34 CET jreher Updated APD location via API.
27. Nov 2019 19:53:24 CET jreher Updated APD location via API.
25. Nov 2019 17:21:56 CET jreher Updated box and position via API.
20. Sep 2019 18:47:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:01 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:22 CEST Tobias Imported from Hamamatsu datasheet.