RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3210035197 - Archived data from Tue, 11. August 2020 17:54:37 CEST


This is all the information about APD 3210035197. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3210035197
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.2 V
Dark current: 21 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 139
Position in Box: 21
EP1 batch: 160
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.7540076 V     T = -25 °C: 341.8111909 V
Voltage for Gain 150: T = +20 °C: 384.5920621 V     T = -25 °C: 349.0638895 V
Voltage for Gain 200: T = +20 °C: 388.9634545 V     T = -25 °C: 353.1526792 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.718962281 V-1     T = -25 °C: 5.12596582 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.293256947 V-1     T = -25 °C: 9.523269535 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.37757573 V-1     T = -25 °C: 15.04320561 V-1
Break-through voltage: T = +20 °C: 404.4754116 V     T = -25 °C: 368.1491277 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:15 CET jreher Updated box and position via API.
11. Aug 2020 17:54:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:14 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:15 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:04:36 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:33 CET jreher Updated APD location via API.
27. Nov 2019 19:53:22 CET jreher Updated APD location via API.
25. Nov 2019 17:21:55 CET jreher Updated box and position via API.
20. Sep 2019 18:47:05 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:49 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:00 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:21 CEST Tobias Imported from Hamamatsu datasheet.