RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3209035145 - Archived data from Tue, 11. August 2020 17:54:33 CEST


This is all the information about APD 3209035145. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3209035145
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.7 V
Dark current: 26.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 138
Position in Box: 47
EP1 batch: 159
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.4913607 V     T = -25 °C: 349.909648 V
Voltage for Gain 150: T = +20 °C: 393.3290628 V     T = -25 °C: 357.294113 V
Voltage for Gain 200: T = +20 °C: 397.6713289 V     T = -25 °C: 361.4493385 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.435617814 V-1     T = -25 °C: 4.969340094 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.731730863 V-1     T = -25 °C: 9.21244815 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.23863475 V-1     T = -25 °C: 16.48492805 V-1
Break-through voltage: T = +20 °C: 412.9565738 V     T = -25 °C: 376.5298014 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:11 CET jreher Updated box and position via API.
11. Aug 2020 17:54:33 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:12 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:31 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:05:07 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:31 CET jreher Updated APD location via API.
27. Nov 2019 19:53:13 CET jreher Updated APD location via API.
25. Nov 2019 17:21:52 CET jreher Updated box and position via API.
20. Sep 2019 18:46:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:00 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:21 CEST Tobias Imported from Hamamatsu datasheet.