RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3209035134 - Archived data from Fri, 05. February 2021 11:06:09 CET


This is all the information about APD 3209035134. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3209035134
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 386.4 V
Dark current: 24.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 138
Position in Box: 37
EP1 batch: 159
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.9152504 V     T = -25 °C: 351.0579701 V
Voltage for Gain 150: T = +20 °C: 394.7333715 V     T = -25 °C: 358.5559819 V
Voltage for Gain 200: T = +20 °C: 399.0602358 V     T = -25 °C: 362.7460504 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.649385088 V-1     T = -25 °C: 4.849204257 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.254540748 V-1     T = -25 °C: 9.77094942 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.43958369 V-1     T = -25 °C: 15.41553954 V-1
Break-through voltage: T = +20 °C: 412.3975581 V     T = -25 °C: 377.182666 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:40:21 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:11 CEST jreher Updated box and position via API.
05. Feb 2021 11:06:09 CET jreher Updated box and position via API.
11. Aug 2020 17:54:31 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:11 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:31 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:05:06 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:30 CET jreher Updated APD location via API.
27. Nov 2019 19:53:12 CET jreher Updated APD location via API.
25. Nov 2019 17:21:51 CET jreher Updated box and position via API.
20. Sep 2019 18:46:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:59 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:21 CEST Tobias Imported from Hamamatsu datasheet.