RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3209035117 - Archived data from Tue, 11. August 2020 17:54:28 CEST


This is all the information about APD 3209035117. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3209035117
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.1 V
Dark current: 22.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 138
Position in Box: 25
EP1 batch: 158
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.6926002 V     T = -25 °C: 349.001472 V
Voltage for Gain 150: T = +20 °C: 392.4960632 V     T = -25 °C: 356.3846448 V
Voltage for Gain 200: T = +20 °C: 396.8133171 V     T = -25 °C: 360.5258845 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.705328273 V-1     T = -25 °C: 4.943593667 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.600463004 V-1     T = -25 °C: 9.098748686 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.951065 V-1     T = -25 °C: 16.15768375 V-1
Break-through voltage: T = +20 °C: 411.9087162 V     T = -25 °C: 375.4660697 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:08 CET jreher Updated box and position via API.
11. Aug 2020 17:54:28 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:10 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:30 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:05:05 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:29 CET jreher Updated APD location via API.
27. Nov 2019 19:53:11 CET jreher Updated APD location via API.
25. Nov 2019 17:21:50 CET jreher Updated box and position via API.
20. Sep 2019 18:46:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:59 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:21 CEST Tobias Imported from Hamamatsu datasheet.