RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3208035061 - Archived data from Tue, 11. August 2020 17:54:21 CEST


This is all the information about APD 3208035061. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3208035061
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.4 V
Dark current: 16 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 137
Position in Box: 40
EP1 batch: 157
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.0604288 V     T = -25 °C: 342.2262431 V
Voltage for Gain 150: T = +20 °C: 384.8980516 V     T = -25 °C: 349.5230917 V
Voltage for Gain 200: T = +20 °C: 389.2891001 V     T = -25 °C: 353.6467485 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.579641285 V-1     T = -25 °C: 4.884286928 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.025439225 V-1     T = -25 °C: 9.108069317 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.94375305 V-1     T = -25 °C: 15.98054853 V-1
Break-through voltage: T = +20 °C: 405.1230135 V     T = -25 °C: 368.6584043 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:01 CET jreher Updated box and position via API.
11. Aug 2020 17:54:21 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:07 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:47 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:05:52 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:27 CET jreher Updated APD location via API.
27. Nov 2019 19:53:02 CET jreher Updated APD location via API.
25. Nov 2019 17:21:47 CET jreher Updated box and position via API.
20. Sep 2019 18:45:30 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:35 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:58 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:20 CEST Tobias Imported from Hamamatsu datasheet.