RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3207035041 - Archived data from Fri, 18. December 2020 14:00:39 CET


This is all the information about APD 3207035041. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3207035041
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.2 V
Dark current: 15.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 137
Position in Box: 31
EP1 batch: 157
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.7930566 V     T = -25 °C: 348.3097524 V
Voltage for Gain 150: T = +20 °C: 391.6784077 V     T = -25 °C: 355.6594926 V
Voltage for Gain 200: T = +20 °C: 396.0492781 V     T = -25 °C: 359.7801019 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.657529065 V-1     T = -25 °C: 4.844225746 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.248187156 V-1     T = -25 °C: 9.874069381 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.44643821 V-1     T = -25 °C: 15.76181179 V-1
Break-through voltage: T = +20 °C: 411.4471128 V     T = -25 °C: 374.8566629 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:43:20 CET jreher Assigned to capsule by script
05. Feb 2021 11:06:00 CET jreher Updated box and position via API.
18. Dec 2020 14:00:39 CET jreher Updated box and position via API.
11. Aug 2020 17:54:19 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:06 CEST jreher Updated APD location via API.
09. Dec 2019 18:14:06 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:06:51 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:06:22 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:26 CET jreher Updated APD location via API.
27. Nov 2019 19:53:01 CET jreher Updated APD location via API.
25. Nov 2019 17:21:46 CET jreher Updated box and position via API.
20. Sep 2019 18:45:29 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:34 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:57 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:20 CEST Tobias Imported from Hamamatsu datasheet.