RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3207035010 - Archived data from Tue, 11. August 2020 17:54:13 CEST


This is all the information about APD 3207035010. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3207035010
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 389 V
Dark current: 21.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 137
Position in Box: 5
EP1 batch: 156
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.7593184 V     T = -25 °C: 352.0649296 V
Voltage for Gain 150: T = +20 °C: 395.5578178 V     T = -25 °C: 359.5263831 V
Voltage for Gain 200: T = +20 °C: 399.8639868 V     T = -25 °C: 363.6802411 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.695474257 V-1     T = -25 °C: 4.848840204 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.563607697 V-1     T = -25 °C: 8.950558771 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.9618866 V-1     T = -25 °C: 15.77169512 V-1
Break-through voltage: T = +20 °C: 414.0395602 V     T = -25 °C: 377.9057636 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:57 CET jreher Updated box and position via API.
11. Aug 2020 17:54:13 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:03 CEST jreher Updated APD location via API.
09. Dec 2019 18:14:22 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:08:26 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:24 CET jreher Updated APD location via API.
27. Nov 2019 19:52:59 CET jreher Updated APD location via API.
25. Nov 2019 17:21:44 CET jreher Updated box and position via API.
20. Sep 2019 18:45:07 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:32 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:56 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:19 CEST Tobias Imported from Hamamatsu datasheet.