RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3207034995 - Archived data from Tue, 11. August 2020 18:09:32 CEST


This is all the information about APD 3207034995. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3207034995
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 387.9 V
Dark current: 17.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 136
Position in Box: 44
EP1 batch: 156
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 411.0108397 V     T = -25 °C: 370.4790327 V
Voltage for Gain 150: T = +20 °C: 411.0335024 V     T = -25 °C: 373.1215899 V
Voltage for Gain 200: T = +20 °C: 411.056165 V     T = -25 °C: 374.2950205 V
Gain/Voltage slope at M = 100: T = +20 °C: 2206.27402 V-1     T = -25 °C: 16.71890986 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 2206.27402 V-1     T = -25 °C: 37.93713346 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 2206.27402 V-1     T = -25 °C: 55.07070563 V-1
Break-through voltage: T = +20 °C: 411.8417241 V     T = -25 °C: 375.770732 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:54 CET jreher Updated box and position via API.
11. Aug 2020 18:09:32 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:03 CEST jreher Updated APD location via API.
29. Jun 2020 16:10:54 CEST jreher Updated APD batch assignment via API.
29. Nov 2019 11:48:23 CET jreher Updated APD location via API.
27. Nov 2019 19:52:51 CET jreher Updated APD location via API.
25. Nov 2019 17:21:43 CET jreher Updated box and position via API.
20. Sep 2019 18:45:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:27 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:56 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:19 CEST Tobias Imported from Hamamatsu datasheet.