RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3206034985 - Archived data from Tue, 11. August 2020 18:09:31 CEST


This is all the information about APD 3206034985. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3206034985
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 20.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 136
Position in Box: 37
EP1 batch: 155
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 406.0541707 V     T = -25 °C: 359.4129635 V
Voltage for Gain 150: T = +20 °C: 406.1309171 V     T = -25 °C: 362.9967517 V
Voltage for Gain 200: T = +20 °C: 406.2076636 V     T = -25 °C: 365.8631325 V
Gain/Voltage slope at M = 100: T = +20 °C: 651.4959635 V-1     T = -25 °C: 20.21680579 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 651.4959635 V-1     T = -25 °C: 31.37126702 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 651.4959635 V-1     T = -25 °C: 32.89924499 V-1
Break-through voltage: T = +20 °C: 408.2143922 V     T = -25 °C: 372.8034076 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:53 CET jreher Updated box and position via API.
11. Aug 2020 18:09:31 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:02 CEST jreher Updated APD location via API.
29. Jun 2020 16:10:53 CEST jreher Updated APD batch assignment via API.
29. Nov 2019 11:48:23 CET jreher Updated APD location via API.
27. Nov 2019 19:52:50 CET jreher Updated APD location via API.
25. Nov 2019 17:21:42 CET jreher Updated box and position via API.
20. Sep 2019 18:44:32 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:27 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:56 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:19 CEST Tobias Imported from Hamamatsu datasheet.