RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3204034860 - Archived data from Tue, 11. August 2020 18:08:13 CEST


This is all the information about APD 3204034860. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3204034860
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 23 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 135
Position in Box: 7
EP1 batch: 153
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.9644742 V     T = -25 °C: 347.4744634 V
Voltage for Gain 150: T = +20 °C: 390.7737223 V     T = -25 °C: 354.8298286 V
Voltage for Gain 200: T = +20 °C: 395.1174227 V     T = -25 °C: 358.9646937 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.59407658 V-1     T = -25 °C: 4.750411686 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.106071511 V-1     T = -25 °C: 9.592047063 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.18382714 V-1     T = -25 °C: 15.04385834 V-1
Break-through voltage: T = +20 °C: 410.6966729 V     T = -25 °C: 374.2875463 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:35:54 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:01:31 CEST jreher Updated box and position via API.
05. Feb 2021 11:05:41 CET jreher Updated box and position via API.
11. Aug 2020 18:08:13 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:55 CEST jreher Updated APD location via API.
09. Mar 2020 17:38:39 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:17 CET jreher Updated APD location via API.
27. Nov 2019 19:52:37 CET jreher Updated APD location via API.
25. Nov 2019 17:21:35 CET jreher Updated box and position via API.
20. Sep 2019 18:42:41 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:16 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:53 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:18 CEST Tobias Imported from Hamamatsu datasheet.