RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3204034849 - Archived data from Tue, 11. August 2020 18:08:11 CEST


This is all the information about APD 3204034849. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3204034849
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 389 V
Dark current: 28.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 134
Position in Box: 48
EP1 batch: 152
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.8530495 V     T = -25 °C: 352.9076513 V
Voltage for Gain 150: T = +20 °C: 396.688154 V     T = -25 °C: 360.364388 V
Voltage for Gain 200: T = +20 °C: 401.0329431 V     T = -25 °C: 364.5585679 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.672324808 V-1     T = -25 °C: 4.915789606 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.230247513 V-1     T = -25 °C: 9.025314056 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.47239068 V-1     T = -25 °C: 15.90049759 V-1
Break-through voltage: T = +20 °C: 415.7876465 V     T = -25 °C: 379.1690954 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:38 CET jreher Updated box and position via API.
11. Aug 2020 18:08:11 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:54 CEST jreher Updated APD location via API.
09. Mar 2020 17:38:38 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:16 CET jreher Updated APD location via API.
27. Nov 2019 19:52:29 CET jreher Updated APD location via API.
25. Nov 2019 17:21:33 CET jreher Updated box and position via API.
17. Sep 2019 12:07:23 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:54:11 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:53 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:17 CEST Tobias Imported from Hamamatsu datasheet.