RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3204034828 - Archived data from Tue, 11. August 2020 18:08:08 CEST


This is all the information about APD 3204034828. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3204034828
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 17.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 134
Position in Box: 29
EP1 batch: 152
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0703945 V     T = -25 °C: 345.6269262 V
Voltage for Gain 150: T = +20 °C: 388.9119234 V     T = -25 °C: 352.9195608 V
Voltage for Gain 200: T = +20 °C: 393.2800792 V     T = -25 °C: 357.0167571 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.612664763 V-1     T = -25 °C: 4.767510073 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.084974032 V-1     T = -25 °C: 9.713076384 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.18335986 V-1     T = -25 °C: 15.46923391 V-1
Break-through voltage: T = +20 °C: 408.6973433 V     T = -25 °C: 371.9292288 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:17:49 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:03 CEST jreher Updated box and position via API.
05. Feb 2021 11:05:36 CET jreher Updated box and position via API.
11. Aug 2020 18:08:08 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:52 CEST jreher Updated APD location via API.
09. Mar 2020 17:38:37 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:15 CET jreher Updated APD location via API.
27. Nov 2019 19:52:27 CET jreher Updated APD location via API.
25. Nov 2019 17:21:32 CET jreher Updated box and position via API.
17. Sep 2019 12:07:22 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:54:09 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:52 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:17 CEST Tobias Imported from Hamamatsu datasheet.