RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3203034815 - Archived data from Tue, 11. August 2020 18:08:06 CEST


This is all the information about APD 3203034815. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3203034815
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 402 V
Voltage for Gain 100 (T=+25°C): 373.7 V
Dark current: 24.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 134
Position in Box: 16
EP1 batch: 151
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.2892191 V     T = -25 °C: 325.2277961 V
Voltage for Gain 150: T = +20 °C: 396.0156916 V     T = -25 °C: 329.680982 V
Voltage for Gain 200: T = +20 °C: 397.4569534 V     T = -25 °C: 338.863383 V
Gain/Voltage slope at M = 100: T = +20 °C: 12.34807175 V-1     T = -25 °C: 60.4413967 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 24.31460452 V-1     T = -25 °C: 161.8742987 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 39.86515422 V-1     T = -25 °C: 64.56235684 V-1
Break-through voltage: T = +20 °C: 396.4037067 V     T = -25 °C: 365.1228229 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:35 CET jreher Updated box and position via API.
11. Aug 2020 18:08:06 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:51 CEST jreher Updated APD location via API.
09. Mar 2020 17:38:21 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:14 CET jreher Updated APD location via API.
27. Nov 2019 19:52:26 CET jreher Updated APD location via API.
25. Nov 2019 17:21:31 CET jreher Updated box and position via API.
17. Sep 2019 12:06:16 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:54:08 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:52 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:17 CEST Tobias Imported from Hamamatsu datasheet.