RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3116034731 - Archived data from Fri, 05. February 2021 11:05:22 CET


This is all the information about APD 3116034731. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3116034731
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 15.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 132
Position in Box: 11
EP1 batch: 149
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5304618 V     T = -25 °C: 344.5277257 V
Voltage for Gain 150: T = +20 °C: 387.3875231 V     T = -25 °C: 351.8581394 V
Voltage for Gain 200: T = +20 °C: 391.7582728 V     T = -25 °C: 355.9761944 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.455049174 V-1     T = -25 °C: 4.79556949 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.667851452 V-1     T = -25 °C: 9.713283366 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.03114551 V-1     T = -25 °C: 15.43273576 V-1
Break-through voltage: T = +20 °C: 403.795733 V     T = -25 °C: 371.1683176 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:56:35 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:10 CET jreher Updated box and position via API.
05. Feb 2021 11:05:22 CET jreher Updated box and position via API.
11. Aug 2020 17:54:05 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:44 CEST jreher Updated APD location via API.
09. Dec 2019 18:15:30 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:08 CET jreher Updated APD location via API.
27. Nov 2019 19:52:06 CET jreher Updated APD location via API.
25. Nov 2019 17:21:24 CET jreher Updated box and position via API.
17. Sep 2019 12:08:19 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:53:57 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:50 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:15 CEST Tobias Imported from Hamamatsu datasheet.