RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3116034716 - Archived data from Tue, 11. August 2020 17:54:02 CEST


This is all the information about APD 3116034716. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3116034716
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 402 V
Voltage for Gain 100 (T=+25°C): 376.3 V
Dark current: 14.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 131
Position in Box: 47
EP1 batch: 148
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.8397798 V     T = -25 °C: 340.5182444 V
Voltage for Gain 150: T = +20 °C: 382.6169557 V     T = -25 °C: 347.6978434 V
Voltage for Gain 200: T = +20 °C: 386.9449071 V     T = -25 °C: 351.7132087 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.767258231 V-1     T = -25 °C: 4.922043593 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.632882141 V-1     T = -25 °C: 10.26420364 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.04337182 V-1     T = -25 °C: 16.7387612 V-1
Break-through voltage: T = +20 °C: 401.3469334 V     T = -25 °C: 365.6418078 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:18 CET jreher Updated box and position via API.
11. Aug 2020 17:54:02 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:42 CEST jreher Updated APD location via API.
09. Dec 2019 18:15:29 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:07 CET jreher Updated APD location via API.
27. Nov 2019 19:51:58 CET jreher Updated APD location via API.
25. Nov 2019 17:21:22 CET jreher Updated box and position via API.
17. Sep 2019 11:36:05 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:53:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:49 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:15 CEST Tobias Imported from Hamamatsu datasheet.