RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3115034689 - Archived data from Fri, 05. February 2021 11:05:16 CET


This is all the information about APD 3115034689. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3115034689
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377 V
Dark current: 17.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 131
Position in Box: 28
EP1 batch: 147
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.7870738 V     T = -25 °C: 342.7500125 V
Voltage for Gain 150: T = +20 °C: 385.588137 V     T = -25 °C: 350.0387358 V
Voltage for Gain 200: T = +20 °C: 389.9264111 V     T = -25 °C: 354.1513615 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.763473641 V-1     T = -25 °C: 5.096283299 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.372211027 V-1     T = -25 °C: 9.528221584 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.68325101 V-1     T = -25 °C: 15.05029653 V-1
Break-through voltage: T = +20 °C: 403.7319328 V     T = -25 °C: 368.8395857 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 15:59:47 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:03:12 CEST jreher Updated box and position via API.
05. Feb 2021 11:05:16 CET jreher Updated box and position via API.
11. Aug 2020 17:53:59 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:40 CEST jreher Updated APD location via API.
09. Dec 2019 18:15:56 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:06 CET jreher Updated APD location via API.
27. Nov 2019 19:51:56 CET jreher Updated APD location via API.
25. Nov 2019 17:21:20 CET jreher Updated box and position via API.
17. Sep 2019 11:37:13 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:53:50 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:49 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:15 CEST Tobias Imported from Hamamatsu datasheet.